Top Questions Clients Ask Before Starting a Hospital Project | ACCO Construction

🏗️ Introduction to ACCO Construction

ACCO Construction is Pakistan’s leading hospital design, healthcare planning, and medical facility construction company, delivering high-quality and compliant healthcare infrastructures for over 20 years. Based in Lahore and serving nationwide, ACCO specializes in:

  • Hospital Architecture & Structural Design

  • Turnkey Healthcare Construction

  • Modular OT, ICU, and CCU Development

  • Hospital MEP Systems

  • PEB & Modular Healthcare Buildings

  • Regulatory Approvals & Licensing Support

We help investors, doctors, government bodies, and private healthcare groups successfully plan and construct hospitals according to international standards.


🩺 Top Questions Clients Ask Before Starting a Hospital Project

(Target Keyword: Hospital Project Planning)

Planning a hospital is one of the most complex construction undertakings in Pakistan. With rising healthcare demand, strict regulatory standards, and large investment requirements, clients come with many essential questions.

This detailed guide by ACCO Construction covers everything clients ask before starting a hospital project.

🔍 1. How Much Does It Cost to Build a Hospital in Pakistan?

Hospital construction cost varies depending on:

Key Cost Drivers

  • Total covered area (sq ft)

  • Number of floors

  • Type of hospital (general, specialty, diagnostics)

  • Finishing quality

  • HVAC, MEP, medical gas systems

  • Fire safety & regulatory compliance

  • Equipment installation

  • Parking and external development

Estimated Costs (2025 Rates)

Hospital TypeCovered AreaEstimated Cost
20–50 Bed Hospital40,000–80,000 sq ftPKR 600M – 1.2B
100 Bed Hospital120,000–180,000 sq ftPKR 1.5B – 2.8B
Diagnostics Center10,000–25,000 sq ftPKR 120M – 280M
Maternity Hospital20,000–45,000 sq ftPKR 250M – 650M

ACCO provides detailed BOQs, cost forecasting, and budget control for all healthcare projects.


📝 2. What Permissions & NOCs Are Required for a Hospital?

Before construction begins, clients must obtain mandatory approvals from:

Approvals Required

  • Architectural Drawings Approval (LDA/CDA/SDA)

  • Structural Drawings Approval

  • Civil Defense Fire NOC

  • Punjab Healthcare Commission License (PHC)

  • Environmental NOC (EPA Punjab)

  • Parking & Traffic Flow Approval

  • Building Completion Certificate

ACCO handles complete approvals & documentation under turnkey delivery.


🕒 3. How Long Does a Hospital Project Take to Complete?

Typical Timelines

  • Concept + Design: 2–4 months

  • Approvals + NOCs: 2–3 months

  • Grey Structure: 6–12 months

  • Finishing & MEP: 8–14 months

Total Project Duration: 16 to 30 months depending on scale and complexity.


🛠️ 4. What Should Be Included in Hospital Architectural Design?

Hospital design must ensure:

Key Areas

  • Emergency access & circulation

  • Zoning of sterile and non-sterile areas

  • Proper ICU, CCU, OT placement

  • HVAC system integration

  • Patient movement & workflow

  • Parking layout

  • Loading bay

  • Admin & service flow separation

  • Pharmacy workflow

  • Waste disposal & CSSD planning

  • Fire exits & evacuation plans

ACCO follows evidence-based design (EBD) to ensure efficiency, safety, and comfort.


⚙️ 5. What Construction Technology Is Ideal for Hospitals?

Construction Options

  1. RCC (Reinforced Concrete Structure) – best for multi-story hospitals

  2. PEB (Pre-Engineered Building) – best for medical labs & diagnostic centers

  3. Hybrid RCC + Steel – fast + durable for medium facilities

  4. Modular Steel Units – ideal for ICU/OT expansions

Comparison

TypeSpeedCostDurabilityBest Use
RCCSlowModerateVery HighLarge hospitals
PEBFastLowMediumClinics/Labs
HybridMediumMediumHighSpecialty units
ModularVery FastHighMediumTemporary ICUs

🩻 6. What Departments Are Required in a Standard Hospital?

Core Departments

  • Emergency

  • ICU & CCU

  • Operation Theatres

  • Radiology & Imaging

  • Pharmacy

  • OPD

  • IPD/Wards

  • Laboratory

  • CSSD

  • Admin & HR

  • Waste Management Area

  • Physician Rooms

  • Nursing Stations

Additional Departments (Optional)

  • Cardiology

  • Orthopedics

  • Oncology

  • Neurology

  • Pediatrics

  • Dialysis Units


🚗 7. How Much Parking Space Does a Hospital Need?

The rule recommended by PHC & WHO:

1 parking space per 3 beds + staff + visitors

For a 100-bed hospital → 60–90 parking slots required.


💵 8. How Can We Avoid Cost Overruns?

Best Practices to Control Costs

  • Complete design before construction starts

  • Use BIM & 3D modeling

  • Accurate BOQs from ACCO

  • Weekly supervision meetings

  • Avoid change orders during finishing

  • Pre-plan all MEP routes

  • Avoid imported materials unless necessary


🧭 9. How Do You Plan a Functional Hospital Workflow?

Hospital workflow influences:

  • Patient safety

  • Efficiency

  • Infection control

  • Staff movement

  • Treatment turnaround time

Workflow Planning Includes

  • Patient entry → diagnosis → treatment → discharge

  • Clean & dirty corridor separation

  • Emergency routes

  • Ventilation & sterilization paths

  • Controlled access areas

  • Signage & wayfinding

ACCO follows WHO & JCI workflow standards for optimal operations.


🧱 10. What Safety Standards Are Mandatory?

Hospital Safety Must Include

  • Fire alarm system

  • Smoke detectors

  • Fire exit stairs

  • Pressurization fans

  • Fire-rated doors

  • Earthquake-resistant structure

  • Backup generator room

  • Dual power system

  • Special OT HVAC with HEPA

  • Emergency lighting

  • Nurse call system


🔌 11. What MEP Systems Are Needed for a Hospital?

Healthcare MEP is highly specialized.

Major MEP Components

  • HVAC (with HEPA & positive pressure)

  • Medical gas piping

  • BMS (Building Management System)

  • Nurse call system

  • Electrical grounding network

  • Fire safety & sprinklers

  • Plumbing & drainage

  • Wastewater treatment

  • UPS & backup power infrastructure

ACCO has dedicated MEP teams for hospital projects.


⚠️ 12. What Are the Common Mistakes in Hospital Projects?

Mistakes to Avoid

  • Incomplete architectural planning

  • Underestimating MEP cost

  • Poor circulation routes

  • No future expansion area

  • Ignoring PHC compliance

  • Hiring inexperienced builders

Pros & Cons of Building a Hospital in Pakistan

✔️ Pros

  • High demand for healthcare

  • Long-term ROI

  • Community impact

  • Government incentives

  • Job creation

  • Investment stability

Cons

  • High upfront investment

  • Strict regulatory requirements

  • Long construction duration

  • Technical complexity


Frequently Asked Questions (FAQs)

1. What is the first step in hospital project planning?

A feasibility study, site analysis, and concept architectural layout.

2. How much land is required for a 50–100 bed hospital?

Typically 1–2 kanal in urban zones; more in non-commercial areas.

3. Can ACCO provide a complete turnkey hospital?

Yes, ACCO handles design, MEP, construction, approvals, and interiors.

4. How much does hospital MEP cost?

Approximately 25–35% of the total construction cost.

5. How long does PHC licensing take?

Usually 2–4 months, depending on documentation and inspections.


🧿 Final Verdict: Why Choose ACCO for Hospital Project Planning?

Hospital construction demands advanced planning, technology, safety, compliance, and workflow optimization. ACCO Construction provides:

  • 20+ years healthcare experience

  • Full turnkey services

  • Advanced design & BIM planning

  • PHC compliance

  • Accurate cost control

  • Expert hospital MEP

  • International-standard finishing

Whether you’re building a 20-bed clinic or a 500-bed medical complex, ACCO ensures smooth execution from concept to completion.

🔗 Suggested Internal Links

  • House Construction in DHA Lahore

  • Commercial Plaza Builders Lahore

  • PEB Structures in Pakistan

  • Hospital Construction Services by ACCO

🌐 Suggested External Links

  • Pakistan Healthcare Commission (PHC)

  • EPA Punjab

  • ArchDaily Hospital Designs

  • WHO Healthcare Facility Planning Guidelines

📞 Call to Action (CTA)

Start your hospital project with the experts!
ACCO offers free consultation, site evaluation, and complete hospital planning services.

📞 Call / WhatsApp: 03111749849
📧 Email: info@acco.com.pk

🌐 Website: www.acco.com.pk.

Turnkey Solutions — Design + Architecture + Construction

Turnkey Solutions — Design + Architecture + Construction In today’s fast-paced construction industry, clients in Pakistan increasingly demand end-to-end solutions. From initial design to final construction, a turnkey approach simplifies project management, ensures quality, and guarantees timely delivery. ACCO Construction,

Read More »

Why You Should Hire a Specialized Hospital Design Firm

Healthcare infrastructure in Pakistan is rapidly evolving due to increased patient loads, growing urban populations, and rising expectations for international-standard healthcare. Designing a hospital is not like designing a commercial plaza or residential building—it requires precision, medical knowledge, regulatory compliance,

Read More »

Pharmacy Placement: What Owners Should Know | ACCO Construction

Introduction to ACCO Construction ACCO Construction is one of Pakistan’s leading design & build companies, headquartered in Gulberg-III, Lahore. With decades of experience in commercial construction, retail design, and healthcare facility development, ACCO has delivered modern pharmacies, clinics, laboratories, and

Read More »

Lab & Diagnostic Area Layout (Simple Plan) – Expert Guide by ACCO

Introduction to ACCO Engineering ACCO Engineering is a leading construction and design company in Pakistan, specializing in modern residential, commercial, and industrial spaces. With years of experience in architectural planning, interior design, and turnkey construction, ACCO has delivered high-quality projects

Read More »

Post a Comment