Hospital Architect Fees in Pakistan: What Drawings Really Cost
When hospital owners in Pakistan collect quotations for design work, the numbers can vary so widely that it is hard to compare them. One firm quotes a few rupees per square foot for “drawings”, another quotes a percentage of construction cost, and a third offers design “free” as part of a construction contract. Understanding hospital architect fees in Pakistan, and what you actually get for them, is essential before you sign anything.
This guide explains how hospital design fees are structured, what a complete design package should include, indicative fee ranges for 2026, the hidden costs of cheap drawings, and how to compare proposals fairly. The goal is simple: to help you pay a fair price for a design that can actually be built, licensed and operated.
⚡ Quick Answer
Hospital design fees in Pakistan are usually quoted either as a percentage of construction cost or as a rate per square foot of covered area. For a complete, coordinated hospital design (architecture, structure, MEP, HVAC, medical gas, fire safety and interior/room data), fees commonly fall in the range of roughly 3–7% of construction cost, depending on size, complexity and scope, with construction supervision often charged separately. Architectural drawings alone cost much less, but they are not enough to build a hospital. Always compare proposals by scope, not by headline price.
🏢 About Hospital Design Hub
Hospital Design Hub is a specialist hospital design and construction company, established in 2000 and focused on healthcare infrastructure: design, construction, consultancy and project management, and the renovation and maintenance of hospital facilities. With more than 50 successfully completed projects, our team has worked on healthcare facilities across Pakistan, including projects such as LDMC, MCH Islamkot, King Edward Medical University / Mayo Hospital, and UOL Hospital Lahore.
We provide complete hospital design under one roof, so owners get architecture, structure, MEP, HVAC and medical gas design that is coordinated from day one and ready to build.
🏥 Why Hospital Design Costs More Than Other Buildings
A hospital is one of the most complex building types. Compared with a house, office or shopping mall, it requires far more design input:
- Clinical planning: every department (OPD, ER, OT, ICU, wards, labour room, imaging, lab, CSSD, pharmacy) has its own workflow, adjacency and space standards.
- Engineering density: HVAC with clean-air zones, medical gas pipelines, essential power, nurse call, fire alarm, and extensive plumbing and drainage.
- Regulatory requirements: provincial healthcare commissions, development authorities, fire safety, PNRA for imaging, and environmental rules.
- Equipment coordination: OT lights, pendants, imaging equipment, sterilisers and lifts all affect structure and services.
- Room data: each room needs its services, finishes, fixtures and equipment specified.
More design work means higher fees, but it also means fewer problems on site. On hospital projects, design is usually a small share of total project cost, while design errors can cost many times more to fix during construction.
📋 What Should a Complete Hospital Design Package Include?
| Design Discipline | Typical Deliverables |
|---|---|
| Clinical planning / brief | Service plan, department schedule, room list and area programme |
| Architecture | Master plan, concept, floor plans, elevations, sections, door and window schedules, finishes, details |
| Structural engineering | Foundation and frame design, calculations, reinforcement drawings, seismic design |
| Electrical | Power, lighting, essential supply, generator and UPS, earthing, lightning protection |
| Low-current systems | Fire alarm, nurse call, data, CCTV, access control, public address |
| Plumbing and drainage | Water supply, hot water, drainage, storm water, water treatment |
| Fire fighting | Hose reels, hydrants, sprinklers as required, fire pumps |
| HVAC | Cooling and heating loads, clean-air systems for OT/ICU, isolation rooms, ventilation |
| Medical gas pipeline | Oxygen, vacuum, medical air, N₂O and other gases, outlets, alarms |
| Interior design | Finishes, furniture layouts, signage and wayfinding |
| Specifications and BOQ | Technical specifications and bill of quantities for tendering |
| Approvals | Submission drawings for development authority and other regulators |
If a proposal covers only architecture, you will have to appoint and pay separate engineers later, and someone will have to coordinate them. For more on choosing a firm, read how to choose the right hospital design firm.
💰 Indicative Hospital Design Fees in Pakistan (2026)
Fees vary by firm, city, project size, complexity and how much of the work is included. The table below gives indicative ranges to help you judge proposals.
| Scope | Common Fee Basis | Indicative Range |
|---|---|---|
| Concept design / feasibility layouts only | Lump sum | Varies with size; a small share of full fees |
| Architectural drawings only (no engineering) | Per ft² or % of cost | Roughly 1–2.5% of construction cost |
| Architecture + structure | % of cost | Roughly 2–4% of construction cost |
| Complete coordinated design (architecture, structure, MEP, HVAC, MGPS, fire, interiors, BOQ) | % of cost | Roughly 3–7% of construction cost |
| Construction supervision / project management | % of cost or monthly fee | Often an additional 1.5–4% |
| Design-build (turnkey) contract | Included in contract sum | Design cost embedded in overall price |
Indicative ranges only, based on typical market practice. Professional bodies such as the Pakistan Council of Architects and Town Planners (PCATP) and the Pakistan Engineering Council (PEC) regulate the professions; check current guidance and always agree scope in writing.
Example: What This Means in Rupees
For an illustrative 50-bed hospital with a building construction cost of around PKR 80 crore (see our 50-bed hospital cost guide):
- Architectural drawings only at 1.5% would be about PKR 1.2 crore, but engineering would still be missing.
- A complete coordinated design at 4.5% would be about PKR 3.6 crore.
- Supervision at 2.5% would add about PKR 2 crore.
A difference of a few crore in design fees can look large on its own. But on a project costing more than PKR 100 crore including equipment, a single major redesign, a failed licensing inspection, or an HVAC system that does not work can easily cost more than that difference.
⚠️ The Hidden Cost of Cheap Hospital Drawings
We are regularly asked to rescue hospital projects that started with low-cost drawings. The problems are remarkably consistent:
- No space for services: floor-to-floor heights too low for ducts and medical gas, forcing ugly bulkheads or redesign.
- Wrong department sizes: OTs too small for modern equipment, ICU beds too close together, no CSSD.
- Licensing failures: layouts that do not meet healthcare commission requirements, discovered only at inspection.
- No coordination: structural beams clashing with ducts, drains running over OTs, shafts in the wrong place.
- No BOQ or specifications: contractors price different things, making tenders impossible to compare and variations inevitable.
- Endless site changes: decisions made on site by the contractor, slowing work and increasing cost.
Cheap drawings are rarely cheap. They move cost from the design stage, where changes are easy, to the construction stage, where changes are expensive. Read our guide to hospital architecture mistakes in Pakistan for more examples.
⚖️ Fee Structures Compared
| Structure | How It Works | Advantages | Watch Out For |
|---|---|---|---|
| Percentage of construction cost | Fee rises with project budget | Common and familiar; scales with complexity | Agree how “construction cost” is defined (does it include equipment?) |
| Rate per square foot | Fixed rate × covered area | Easy to understand | Area definitions; scope often narrower than it appears |
| Lump sum | Fixed total fee for defined scope | Budget certainty | Changes in scope lead to extra fees |
| Time-based | Hourly or monthly rates | Suits advisory or uncertain scope | Needs a cap or clear estimate |
| Design-build (turnkey) | Design included in construction contract | Single point of responsibility, less coordination risk | Ensure design quality and owner review rights are protected |
📅 Typical Payment Stages
| Stage | Typical Share of Design Fee |
|---|---|
| Mobilisation / brief and concept | 10–20% |
| Schematic design and approvals | 15–25% |
| Detailed design and working drawings | 30–40% |
| Tender documents, specifications and BOQ | 10–15% |
| Construction stage services / as-builts | 10–20% |
🔍 How to Compare Hospital Design Proposals
- List the disciplines included: architecture, structure, electrical, plumbing, fire, HVAC, medical gas, low-current, interiors.
- Check the deliverables: working drawings, details, specifications, BOQ, approval drawings, room data sheets.
- Check healthcare experience: ask for completed hospital projects, not just drawings.
- Clarify revisions: how many design revisions are included before extra fees apply?
- Clarify site services: are site visits, shop drawing review and as-built drawings included?
- Confirm professional registration: PCATP for architects and PEC for engineers.
- Ask who coordinates: one team responsible for all disciplines, or separate consultants?
- Compare total cost of design + supervision, not just the drawing fee.
✅ Pros and Cons: Separate Design Consultant vs Design-Build
| Separate Design Consultant | Design-Build / Turnkey |
|---|---|
|
|
Learn more about turnkey hospital projects and how to vet a hospital construction contractor.
💡 How to Get the Best Value From Your Design Fee
- Invest in the brief: decide services, bed numbers and specialties before design starts.
- Involve clinicians early: heads of OT, ICU, nursing and lab should review layouts at concept stage.
- Freeze decisions stage by stage: changes after working drawings are expensive for everyone.
- Ask for a BOQ: it lets you compare contractor prices properly and control variations.
- Plan for expansion: a few extra hours of design now can save a major rebuild later.
🛠️ Hospital Design Hub’s Design Services
Hospital Design Hub offers complete, coordinated hospital design under one roof: feasibility, master planning, architecture, structure, MEP, HVAC, medical gas, fire safety, interiors, specifications, BOQs and approval drawings. We can also carry the project through construction as a turnkey partner. See our architecture design, design consultancy services and pricing plans.
📅 How Long Does Hospital Design Take?
Design fees and design time go together. A rushed design is almost always an incomplete one. Typical durations for a 50–100 bed hospital are:
| Design Stage | Typical Duration | Key Owner Decisions |
|---|---|---|
| Brief and space programme | 2–4 weeks | Services, bed numbers, specialties, budget |
| Concept design | 3–6 weeks | Block layout, number of floors, department locations |
| Schematic design and approvals drawings | 4–8 weeks | Room layouts, elevations, submission to authorities |
| Detailed design (all disciplines) | 8–16 weeks | Finishes, equipment list, HVAC and electrical strategy |
| Specifications, BOQ and tender documents | 3–6 weeks | Approve quality levels and budget |
In a design-build approach, construction of foundations and structure can start while later design stages continue, which shortens the overall programme considerably.
🚩 Red Flags in a Hospital Design Proposal
- No list of deliverables: a one-line quote such as “complete drawings” with no schedule of what that means.
- No engineering disciplines named: HVAC and medical gas missing is common and very costly to add later.
- No healthcare portfolio: residential or commercial experience does not transfer directly to hospitals.
- Unlimited revisions promised at a very low fee: usually means little real design effort per revision.
- No mention of approvals: the owner is left to handle development authority and regulatory submissions alone.
- No professional registration details: always check PCATP and PEC registration.
- No site involvement: the designer disappears once drawings are handed over, leaving the contractor to interpret them.
📝 Clauses to Include in Your Design Agreement
A clear written agreement protects both the owner and the design team. At a minimum, it should state:
- The full scope of services and every discipline included.
- The list of drawings, specifications, BOQs and reports to be delivered at each stage.
- The fee basis, how “construction cost” is defined if fees are percentage-based, and the payment schedule.
- The number of design revisions included at each stage and the rate for additional changes.
- Responsibilities for authority submissions and approvals.
- Site visit frequency and construction-stage services, if any.
- Ownership and use of drawings, including rights for future expansion.
- Programme dates for each design stage.
- Professional indemnity or liability arrangements, where applicable.
Taking a few days to agree these points before design starts avoids months of disagreement later, and makes it much easier to hold every party to the quality and timing you are paying for.
❓ Frequently Asked Questions
How much do architects charge for hospital design in Pakistan?
Fees vary widely. As an indicative guide, architectural drawings alone are often around 1–2.5% of construction cost, while a complete coordinated hospital design including all engineering commonly falls around 3–7%, with supervision charged separately.
Why are hospital design fees higher than for houses or offices?
Hospitals need clinical planning, dense engineering services such as HVAC and medical gases, equipment coordination and regulatory compliance, which require much more design work.
Are design fees charged per square foot or as a percentage?
Both are common. Percentage fees scale with project cost, while per-square-foot fees are simple to understand. What matters most is the scope included.
Is construction supervision included in design fees?
Usually not. Supervision and project management are often charged separately, commonly as an additional percentage of construction cost or as a monthly fee.
What is included in a complete hospital design package?
Clinical planning, architecture, structure, electrical, low-current systems, plumbing, fire fighting, HVAC, medical gases, interiors, specifications, BOQ and approval drawings.
Is design-build cheaper than hiring a separate architect?
It can reduce overall time and coordination risk because one party is responsible for design and construction. Total cost depends on the contractor and how clearly the owner defines requirements.
What registrations should a hospital architect have in Pakistan?
Architects should be registered with the Pakistan Council of Architects and Town Planners, and engineers with the Pakistan Engineering Council.
Can I use cheap drawings and fix problems during construction?
This usually costs far more. Design problems discovered on site lead to demolition, delays, variations and sometimes licensing failures.
📞 Get a Clear, Itemised Design Proposal
Share your project size and services, and our team will send a transparent design proposal listing every discipline and deliverable included, so you can compare like with like.
Call: +92 322 8000190 | Email: info@hospitaldesignhub.com | Web: hospitaldesignhub.com