πŸ₯ 100 Bed Hospital Design Plan Layout – Complete Guide for Pakistan | ACCO Construction

πŸ‘· About ACCO Construction

ACCO Construction is Pakistan’s trusted name in hospital architecture, healthcare facility design, and turnkey construction solutions. Based in Lahore, we have over 20 years of experience designing, constructing, and managing healthcare and commercial facilities nationwide. Our team specializes in smart hospital layouts, modular healthcare buildings, and custom hospital infrastructure planning that meets PMC, WHO, and NABH standards. Whether it’s a 100-bed general hospital or a multi-specialty medical facility, ACCO ensures a sustainable, efficient, and patient-centric design from start to finish.


πŸ—οΈ Topic Introduction: Why a 100 Bed Hospital Design Plan Matters in Pakistan

In a country like Pakistan, where the doctor-to-patient ratio is far below WHO recommendations and healthcare infrastructure is under pressure, efficient hospital design is no longer optionalβ€”it’s essential. A well-planned 100 bed hospital provides the right balance between capacity, function, and affordability. It’s ideal for:

  • Medium-sized cities

  • Private healthcare entrepreneurs

  • Government rural healthcare expansion

  • NGO-run medical setups

  • Military and corporate medical units

With urbanization, increasing population, and epidemic threats, Pakistan needs cost-effective and scalable hospital plans. A 100-bed hospital can serve over 400+ patients daily, making it a highly feasible solution for growing communities.


πŸ“ 100 Bed Hospital Design Plan Layout – Key Components

Let’s break down the critical areas of a 100-bed hospital, ensuring an optimized workflow, hygiene control, patient comfort, and staff efficiency.


πŸ₯ 1. Departmental Zoning

Efficient zoning is the backbone of hospital functionality.

πŸ”Ή Clinical Zones:

  • Outpatient Department (OPD): 6–10 consultation rooms

  • Emergency Room (ER): 6–8 beds with triage

  • ICU / CCU: 10–12 beds with monitoring

  • General Wards: 60–70 beds (men/women)

  • Private Rooms: 10–15 rooms

  • Operation Theatres (OTs): 3–5 with sterilization unit

  • Diagnostic Imaging: X-ray, ultrasound, CT/MRI (optional)

  • Laboratory: Pathology, biochemistry, hematology

πŸ”Ή Support Areas:

  • Pharmacy (In-patient & Out-patient)

  • Sterile Supply Unit (CSSD)

  • Blood bank

  • Central oxygen & medical gas supply

  • Laundry and linen

  • Kitchen and dietary

πŸ”Ή Administrative Zones:

  • Billing & reception

  • HR, finance, and medical record room

  • Doctor’s lounge, nurse stations

  • Conference & training rooms


πŸ“Š 2. Space Planning – Area Distribution (in sq. ft.)

DepartmentArea (sq. ft.)
OPD5,000
IPD (In-Patient Dept.)20,000
Operation Theatres3,500
Emergency Unit3,000
ICU / NICU2,500
Imaging & Lab3,500
Admin & Support4,000
Circulation/Waiting Areas7,000
Total (approx)48,500 – 55,000

πŸ—οΈ 3. Modern Design Features

βœ… Modular Room Layouts
βœ… Negative Pressure Ventilation in ICU
βœ… Smart Nurse Call Systems
βœ… Energy-Efficient HVAC Systems
βœ… Natural Light & Ventilation in General Wards
βœ… Green Building Materials
βœ… Anti-microbial Flooring (Epoxy / Vinyl)
βœ… Seismic Resistant Structural Design


πŸ’° 4. Estimated Cost in Pakistan (2025)

ComponentRate (PKR)Estimated Cost
Grey StructureRs. 3,500–4,000/sq.ft.Rs. 200–220 Million
Finishing WorksRs. 2,500–3,000/sq.ft.Rs. 150–170 Million
Equipment & FurnishingVariableRs. 80–120 Million
Total Estimated CostΒ Rs. 450–510 Million

Note: Rates may vary based on city, materials, and client requirements.


βœ… Pros and ❌ Cons of 100 Bed Hospital Design

βœ… Pros

  • βš•οΈ Optimal Capacity for Urban/Rural Areas

  • πŸ’° Lower Cost per Bed Than Larger Hospitals

  • πŸ”„ Scalable and Modular Expansion Possible

  • 🏒 Faster Construction Timeline (12–18 months)

  • 🎯 Ideal for Private Healthcare Investors

  • πŸ‘©β€βš•οΈ Better Staff-to-Patient Ratio Management

❌ Cons

  • ❗ Limited Specialized Departments (e.g., Cancer, Cardiac)

  • πŸ’Ό High Initial Setup Cost

  • πŸ”‹ Requires Reliable Backup Power Systems

  • πŸ§ͺ May Depend on Larger Hospitals for Advanced Labs


❓ Frequently Asked Questions (FAQs)

1. How much land is required for a 100-bed hospital in Pakistan?

You typically need 1.5 to 2.5 acres for a standard ground+1 or ground+2 structure, with parking, landscaping, and future expansion.

2. Can a 100-bed hospital be built in phases?

Yes, modular planning allows you to start with 50 beds and expand later based on demand and budget.

3. What are the licensing requirements for hospitals in Pakistan?

You need approval from Punjab Healthcare Commission (PHC) or your respective province’s Health Department, plus building permissions from local development authorities.

4. How long does it take to complete a 100-bed hospital?

Generally, 12–18 months from design approval to commissioning, depending on construction methods and approvals.

5. Does ACCO provide equipment procurement and interior design?

Yes, ACCO offers turnkey hospital solutions including equipment layout, HVAC, medical gas, and interior design.


🧭 Final Verdict – Should You Consider a 100 Bed Hospital Plan?

If you’re planning to invest in healthcare infrastructureβ€”whether you’re an NGO, private healthcare provider, government body, or medical entrepreneur, a 100-bed hospital is a practical, scalable, and impactful option in the Pakistani context. It provides a balance of operational feasibility and patient volume, especially in Tier 2 and Tier 3 cities.

πŸ’‘ Pro Tip: Designing right from day one reduces running costs, improves infection control, and boosts patient recovery rates.


πŸ”— Internal Links

Explore related services by ACCO Construction:


🌐 External Links (High Authority Sources)


πŸ“ž Contact ACCO Today for a Free Consultation!

Whether you’re at the idea stage or ready to build, ACCO Construction offers free project consultations for all hospital and healthcare infrastructure needs.

πŸ“² Phone: 0322-8000190
πŸ’¬ WhatsApp: Click to Chat
🌐 Contact Page


🏁 Let’s Build a Better Healthcare Future, Together.

Partner with ACCO Construction for designing and delivering healthcare infrastructure that saves lives, improves outcomes, and empowers communities.

Post a Comment